+86 0519 8878 2189
News Center
Home / News

air handling unit

Knowing that you are interested in air handling unit, we have listed articles on similar topics on the website for your convenience. As a professional manufacturer, we hope that this news can help you. If you are interested in learning more about the product, please feel free to contact us.
The air volume of the combined clean air conditioning unit ranges from 3,500m3/h to 200,000m3/h for 12 functional segments for users to choose and combine freely. It is mainly suitable for air purification systems in various clean plants, such as industrial electronics plants, precision machinery ma

07

2021-06

How to install the combined air conditioning unit?
How to install the combined air conditioning unit? 1. The combined air-conditioning unit should be installed horizontally in the interlayer of the ceiling. The side of the condensate pipe is allowed to be as low as five thousandths, but not to be higher, so as to ensure the smooth discharge of c

26

2021-05

What are the advantages of precision air conditioners?
For precision air conditioners, it is mainly to eliminate the sensible heat emitted by the equipment in the computer room, the heat load emitted by the indoor staff, and the heat and humidity load of the fresh air entering the room in summer (only 5% of the total load).The precision air conditioner

24

2021-05

Air Handling Unit for Hospital
High in clean operating room occasion with air handling units, in addition to the basic function of confiquration,effectively filter with junior high school,eguipped with electric heating and humidification, mainly considering particularity medical situations, adopt double cold source system (chille

20

2021-05

Application of Air-cooled dehumidifiers
Air-cooled dehumidifiers in Southeast Asia are used to dry up to 95% of relatively soft (RH) air at temperatures from +15ºC to +40ºC. It is widely used in tropical and subtropical climates in Southeast Asia and South America.The applications are widely distributed. Here are some examples:-Top treatm

06

2021-05

Air Conditioning Unit for High-speed Rail Station
Vrcoolertech Air Conditioning successfully signed a high-speed rail station construction project equipment contract to provide it with 6 sets of evaporative cooling air-conditioning units.For a long time, vrcooler insists on focusing on market development, and wholeheartedly provides customers with
  • Total 11 pages  Go to Page
  • Go

PHONE

International Business:+86 0519 8878 2189

Domestic business:+86 0519 8878 2190

QUICK LINKS

PRODUCTS

ABOUT US

When it comes to building heat exchanger for any application VRCOOLERTECH has the capability to meet your requirements.
Copyright © 2021 Changzhou Vrcoolertech Refrigeration Co.,Ltd All rights reserved.  Sitemap  Manage Entrance