Views: 0 Author: Site Editor Publish Time: 2026-07-02 Origin: Site
Number of Technicians Required to Install Rear Door Heat Exchanger (RDHX)
1. Lifting & Mounting
Lightweight passive RDHX (18–32 kg / 39–70 lbs)
Minimum 2 trained technicians
Two people hold the left & right built-in handles to lift, unpack and hang the door frame.
Standard active RDHX (32–55 kg / 70–121 lbs, mainstream 42U/48U liquid cooling rear door)
Mandatory 3 trained technicians (industry standard)
One person at each end, one supporting the middle grip; required for rotating the horizontal unit upright, carrying to rack rear, aligning hinge pins and fixing brackets. Three-person rule for safety to avoid tilting, deformation or injury.
Heavy-duty high-capacity active RDHX (≥50 kg)
4 technicians minimum
Extra staff to stabilize the bottom water pipe ports and prevent collision during positioning.
2. Full complete installation crew (including plumbing, wiring, commissioning)
After hanging the door body, extra manpower is needed for pipe connection, power wiring, air bleeding and leak testing:
Small single rack retrofit: 3 people total
2 for lifting/mounting + 1 plumbing technician to connect hoses, bleed air and test leakage.
Mass data center batch deployment: 4–5 people per rack group
3 handling the RDHX unit
1 pipe fitter for CDU manifold connection
1 electrician for fan power, temperature sensor wiring & functional debugging
Finned Tube Hydrogen Cooler, Generator Hydrogen Surface Cooler for Power Plant Turbo Generator
Spray Booth Air Conditioner for Industrial Painting Workshop
All‑Aluminum Water‑to‑Air Heat Exchangers for OEM & Replacement Projects
Spray‑Assisted Adiabatic Dry Cooler Shipped to Customer in Saudi Arabia
Cabinet In‑Row CDU for Modern Liquid‑Cooled Data Center Projects
Multi-stage Counter-flow Heat Pipe System Electrical Cabinet Heat Sink
Mushroom Growing Air Conditioner for Edible Fungus Cultivation
International Business:+86 0519 8878 2189
Domestic business:+86 0519 8878 2190