+86 0519 8878 2189
News Center
Home / News

air handle unit

Knowing that you are interested in air handle unit, we have listed articles on similar topics on the website for your convenience. As a professional manufacturer, we hope that this news can help you. If you are interested in learning more about the product, please feel free to contact us.

An Air Handling Unit (AHU) is used to re-condition and circulate air as part of a heating, ventilating and air-conditioning system. The basic function of the AHU is to take in outside air, re-condition it and supply it as fresh air to a building. All exhaust air is removed, which creates an acceptab

14

2021-06

How to install the ceiling-mounted air conditioning unit?

How to install the ceiling-mounted air conditioning unit correctly?The ceiling-mounted air conditioning unit is composed of a mixing section, a filter section, a surface cooling section, a humidifier section, and a centrifugal fan section. The cooling water is evaporated by the air conditioner evapo

11

2021-06

The functional section of the combined air conditioning unit

Fan section, filter section, surface cooling section, humidification section and sterilization section are the most common and practical functions of modular air conditioning units. You can contact us for design and quotation according to the requirements of the installation site and industry standards.

09

2021-06

The Advantage of Vrcoolertech Combined Clean Air Conditioning Unit

The air volume of the combined clean air conditioning unit ranges from 3,500m3/h to 200,000m3/h for 12 functional segments for users to choose and combine freely. It is mainly suitable for air purification systems in various clean plants, such as industrial electronics plants, precision machinery ma

07

2021-06

How to install the combined air conditioning unit?

How to install the combined air conditioning unit? 1. The combined air-conditioning unit should be installed horizontally in the interlayer of the ceiling. The side of the condensate pipe is allowed to be as low as five thousandths, but not to be higher, so as to ensure the smooth discharge of c

06

2021-05

Air Conditioning Unit for High-speed Rail Station

Vrcoolertech Air Conditioning successfully signed a high-speed rail station construction project equipment contract to provide it with 6 sets of evaporative cooling air-conditioning units.For a long time, vrcooler insists on focusing on market development, and wholeheartedly provides customers with

PHONE

International Business:+86 0519 8878 2189

Domestic business:+86 0519 8878 2190

QUICK LINKS

PRODUCTS

ABOUT US

When it comes to building heat exchanger for any application VRCOOLERTECH has the capability to meet your requirements.
Copyright © 2021 Changzhou Vrcoolertech Refrigeration Co.,Ltd All rights reserved.  Sitemap  Manage Entrance